Category: Concrete machines / Beton-Maschinen

Henke Variant – Brick Manufacturing Plant / Steinfertigungsanlage

ID: 2953
year/Baujahr: 1993

ID2953 Henke Variant year/Baujahr 1992/93 Brick Manufacturing Plant with core and attachment, for the production of paving stones, slabs, kerbstones, U and L stones, hollow blocks Board size 1,350 x 1,150mm (approx. 1935 piece) Min. product height 40 mm Max. …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/henke-variant-brick-manufacturing-plant-steinfertigungsanlage/

Eirich – compulsory mixer / Zwangsmischer 2500 Liter

ID: 2952

ID2952 Eirich compulsory mixer/Zwangsmischer 2500 Liter compulsory mixer 2500 Liter Zwangsmischer 2500 Liter

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/eirich-compulsory-mixer-zwangsmischer-2500-liter/

Eirich – compulsory mixer/Zwangsmischer 1500 Liter

ID: 2951

ID2951 Eirich compulsory mixer/Zwangsmischer 1500 Liter compulsory mixer 1500 Liter Zwangsmischer 1500 Liter

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/eirich-compulsory-mixer-zwangsmischer-1500-liter/

Supra – Schaltische/scarf tables

ID: 2950

ID2950 Supra Schaltische/scarf tables 67 Avermann tables Wachenroth (Supra) 2.40 m formwork width 2.70 m total width 10.50m length 5 cm upstand 60 cm total height 24 cm smallest distance when stacking (max. occupancy approx. 15 tons) 67 Stück Avermann-Tische …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/supra-schaltische-scarf-tables/

Putzmeister HM25 AZ 24/100 – mobile Concrete pump / Mobile Betonpumpe

ID: 2652
year/Baujahr: 1995
hours/Stunden/Kilometer: 1210

ID2652 Putzmeister HM25 AZ 24/100 year/Baujahr approx. 1995 approx. 1210 hours/Stunden Mobile Concrete pump Putzmeister HM25 AZ 24/100 on tracks (25 t Atlas undercarriage), approx. 24 m boom, radio remote control, wired remote control, approx. 60 -70 cbm pump capacity, …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/putzmeister-hm25-az-24-100-mobile-concrete-pump-mobile-betonpumpe/

Complete sand-lime brick plant / komplettes Kalksandstein-Werk

ID: 2267

ID2267 Complete sand-lime brick plant Kalksandstein-Werk Complete sand-lime brick plant, output 70,000-120,000 NF per day (2 shifts of 8 hours each), more information on request komplettes Kalksandstein-Werk, Leistung 70.000-120.000 NF pro Tag (2 Schichten a‘ 8 Std), mehr Infos auf …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/complete-sand-lime-brick-plant-komplettes-kalksandstein-werk/

Putzmeister – concrete pump with e-motor / Betonpumpe mit E-Motor

ID: 2259

ID2259 Putzmeister concrete pumpe with e-motor concrete pump with e-motor, 2 pistons (100 mm piston, stroke approx. 1 meter) Betonpumpe mit E-Motor, 2 Kolben (100 mm Kolben, Hub ca. 1 Meter)

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/putzmeister-concrete-pump-with-e-motor-betonpumpe-mit-e-motor/

Pedershaab Multiflex – Plant for production of concrete pipes

ID: 2149

ID2149 Pedershaab Multiflex – Plant for the production of concrete pipes Plant for the production of concrete pipes, little used, with concrete feeder, with 10 jackets for 1m pipes, with 4 cores (300, 400, 500, 600 mm diameter) for 1m …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/pedershaab-multiflex-plant-for-production-of-concrete-pipes/

Häny MCM-2000 – suspension mixing plant / Suspensions-Mischanlage

ID: 1887
year/Baujahr: 1998

ID1887 Häny MCM-2000 year/Baujahr 1998 Mixing plant Häny MCM-2000. The mixing plant was in this configuration as a unit on the way and was used for the mixing of cement and sealing wall suspensions, without silo! Mischanlage Häny MCM-2000. Die …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/haeny-mcm-2000-suspension-mixing-plant-suspensions-mischanlage/

Sandau B91 – Residual water recycling plant / Restwasser Recyclinganlage

ID: 1845
year/Baujahr: 1996

ID1845 Sandau B91 – Residual water recycling plant year/Baujahr 1996 6,5 t Residual water recycling plant, with control unit, almost not used (as new), power 25 cbm / h Restwasser Recyclinganlage, mit Schaltkasten, fast nicht benutzt (neuwertig), Leistung 25 cbm/h

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/sandau-b91-residual-water-recycling-plant-restwasser-recyclinganlage/

Krupp GFT – Complete additive dosing / Komplette Additivdosierung

ID: 1738
year/Baujahr: 1996

Complete additive dosing, 8 pieces of small component containers a ‚1 cbm, 2 pieces of scales Pfister, blow-through lock with pre-tank, there are no motors from the screws and various knockers or vibrators from the suction system Komplette Additivdosierung, 8 …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/krupp-gft-complete-additive-dosing-komplette-additivdosierung/