Category: Concrete machines / Beton-Maschinen

Liebherr Betomat III-570 – concrete mixing plant / Betonmischanlage

ID: 2123
year/Baujahr: 1985-2001

ID2123 Liebherr Betomat III-570 year/Baujahr 1985-2001 complete concrete mixing plant with 3 mixers (2 x ZE1500 / 2250, 1 x ZE 500/750), Sauer dosing system (year of construction approx. 2005) komplette Betonmischanlage mit 3 Mischern (2 x ZE1500/2250, 1 x …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/liebherr-betomat-iii-570-concrete-mixing-plant-betonmischanlage/

Metax MP7 – High pressure pump / Hochdruckpumpe

ID: 2292
year/Baujahr: 2007
hours/Stunden/Kilometer: 5200

ID2292 Metax MP7 year/Baujahr 2007 approx. 5200 hours/Stunden High pressure pump, engine Deutz BF8M1015CP (440kW), Diesel engine was cpl. overhauled by Deutz at 4450 hours (year 2019), ZF transmission Ecosplit, grouting pump P7 Hochdruckpumpe, Motor Deutz BF8M1015CP (440kW), Dieselmotor wurde …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/metax-mp7-high-pressure-pump-hochdruckpumpe/

Complete sand-lime brick plant / komplettes Kalksandstein-Werk

ID: 2267

ID2267 Complete sand-lime brick plant Kalksandstein-Werk Complete sand-lime brick plant, output 70,000-120,000 NF per day (2 shifts of 8 hours each), more information on request komplettes Kalksandstein-Werk, Leistung 70.000-120.000 NF pro Tag (2 Schichten a’ 8 Std), mehr Infos auf …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/complete-sand-lime-brick-plant-komplettes-kalksandstein-werk/

Meiko GM90 – mobile spray gun / Spritzmobile

ID: 2264
year/Baujahr: ca. 2000

ID2264 Meiko GM90 year/Baujahr approx. 2000 3 pieces mobile spray guns, electrically driven, including wear parts (discs and plates) 3 Stück Spritzmobile, elektrisch angetrieben, inkl. Verschleißteile (Scheiben und Platten)

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/meiko-gm90-mobile-spray-gun-spritzmobile/

Putzmeister – concrete pump with e-motor / Betonpumpe mit E-Motor

ID: 2259

ID2259 Putzmeister concrete pumpe with e-motor concrete pump with e-motor, 2 pistons (100 mm piston, stroke approx. 1 meter) Betonpumpe mit E-Motor, 2 Kolben (100 mm Kolben, Hub ca. 1 Meter)

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/putzmeister-concrete-pump-with-e-motor-betonpumpe-mit-e-motor/

STS Scheltzke PS160 EA-KV – pump station /Pumpstation

ID: 2244
year/Baujahr: 2007
hours/Stunden/Kilometer: 8700

ID2244 STS Scheltzke PS160 EA-KV year/Baujahr 2007 approx. 8700 hours/Stunden Pump station, drive: electro-hydraulic, drive power: 30 kW Pumpstation, Antrieb: Elektro-hydraulisch, Antriebsleistung: 30 kW

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/sts-scheltzke-ps160-ea-kv-pump-station-pumpstation/

Arbau Euro 80T – concrete mixing plant / Betonmischanlage

ID: 2169
year/Baujahr: approx. 1980

ID2169 Arbau Euro 80T year/Baujahr approx. 1980 Concrete mixing plant (star system), brand Arbau, type: Euro 80T with pocket distributor, 1.5 cbm mixer, output 65 cbm/h, 4 x cement silo, electrics, control and additive system renewed in 2012 Betonmischanlage (Sternanlage), …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/arbau-euro-80t-concrete-mixing-plant-betonmischanlage/

Pedershaab Multiflex – Plant for production of concrete pipes

ID: 2149

ID2149 Pedershaab Multiflex – Plant for the production of concrete pipes Plant for the production of concrete pipes, little used, with concrete feeder, with 10 jackets for 1m pipes, with 4 cores (300, 400, 500, 600 mm diameter) for 1m …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/pedershaab-multiflex-plant-for-production-of-concrete-pipes/

Sommer – Folding pallet system for the production of double wall elements

ID: 2018

Sommer Folding pallet system for the production of double wall elements Klapp-Paletten-Anlage zur Herstellung von Doppelwandelementen year/Baujahr 1979 Folding pallet system for the production of double wall elements consisting of a 180 ° swiveling pallet (7200 x 3070 mm), adjustable …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/sommer-folding-pallet-system-for-the-production-of-double-wall-elements/

Obermann MPR800 – concrete mixer / Betonmischer

ID: 1914
year/Baujahr: 2005
hours/Stunden/Kilometer: 6810
weight/Gewicht (t): 3,8 t

ID1914 Obermann MPR800 year/Baujahr 2005 approx. 6800 hours/Stunden 3,8 t Mixer, capacity 16 cbm / h at 20 cycles, 20.8 cbm / h at 26 cycles Mischer, Leistung 16 cbm/h bei 20 Zyklen, 20,8 cbm/h bei 26 Zyklen

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/obermann-mpr800-concrete-mixer-betonmischer/

Häny MCM-2000 – suspension mixing plant / Suspensions-Mischanlage

ID: 1887
year/Baujahr: 1998

ID1887 Häny MCM-2000 year/Baujahr 1998 Mixing plant Häny MCM-2000, with 80 cbm solid silo manufactured by Stanelle, 2 x cement screw conveyors. The mixing plant was in this configuration as a unit on the way and was used for the …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/haeny-mcm-2000-suspension-mixing-plant-suspensions-mischanlage/

Elba RSK 30C – Stern-Schrapper

ID: 1855
year/Baujahr: 1992

Elba RSK 30C – Stern-Schrapper year/Baujahr 1992 Elba Radialschrapp automat RS/M 40, 17,3 m, 4-part lattice boom for scrapers Elba Radialschrapp-Automat RS/M 40, 17,3 m, 4-teiliger Gitterausleger für Schrapper

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/elba-rsk-30c-stern-schrapper/

Sandau B91 – Residual water recycling plant / Restwasser Recyclinganlage

ID: 1845
year/Baujahr: 1996

ID1845 Sandau B91 – Residual water recycling plant year/Baujahr 1996 6,5 t Residual water recycling plant, with control unit, almost not used (as new), power 25 cbm / h Restwasser Recyclinganlage, mit Schaltkasten, fast nicht benutzt (neuwertig), Leistung 25 cbm/h

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/sandau-b91-residual-water-recycling-plant-restwasser-recyclinganlage/

ORU – concrete mixing plant with silo / Betonmischer mit Silo

ID: 1759

Concrete mixing plant ORU with 500 l drum, semi-automatic with cement silo 20 to and scrapper, in need of repair Betonmischanlage ORU  mit 500 l Trommel, halbautomatisch mit Zementsilo 20 to und Schrapper, reparaturbedürftig

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/oru-concrete-mixing-plant-with-silo-betonmischer-mit-silo/

Krupp GFT – Complete additive dosing / Komplette Additivdosierung

ID: 1738
year/Baujahr: 1996

Complete additive dosing, 8 pieces of small component containers a ‘1 cbm, 2 pieces of scales Pfister, blow-through lock with pre-tank, there are no motors from the screws and various knockers or vibrators from the suction system Komplette Additivdosierung, 8 …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/krupp-gft-complete-additive-dosing-komplette-additivdosierung/