Category: Concrete machines / Beton-Maschinen

Putzmeister HM25 AZ 24/100 – mobile Concrete pump / Mobile Betonpumpe

ID: 2652
year/Baujahr: 1995
hours/Stunden/Kilometer: 1210

ID2652 Putzmeister HM25 AZ 24/100 year/Baujahr approx. 1995 approx. 1210 hours/Stunden Mobile Concrete pump Putzmeister HM25 AZ 24/100 on tracks (25 t Atlas undercarriage), approx. 24 m boom, radio remote control, wired remote control, approx. 60 -70 cbm pump capacity, …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/putzmeister-hm25-az-24-100-mobile-concrete-pump-mobile-betonpumpe/

Putzmeister PM 702E – shotcrete pump / Spritzbetonpumpe

ID: 2621
year/Baujahr: 2009

ID2621 Putzmeister PM 702E year/Baujahr 2009 shotcrete pump Spritzbetonpumpe

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/putzmeister-pm-702e-shotcrete-pump-spritzbetonpumpe/

Putzmeister BSA 1408 EAC – Trailer concrete pump / Anhänger-Betonpumpe

ID: 2618
year/Baujahr: 2016

ID2618 Putzmeister BSA 1408 EAC year/Baujahr 2016 Trailer concrete pump Anhänger-Betonpumpe

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/putzmeister-bsa-1408-eac-trailer-concrete-pump-anhaenger-betonpumpe/

Formwork robot with RES device / Schalungsroboter mit RES Gerät

ID: 2563

ID2563 Formwork robot with RES device / Schalungsroboter mit RES Gerät Formwork robot with RES device, the robot and the RES device were used for a floor slab and double wall production with a standard width of 3.00m Schalungsroboter mit …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/formwork-robot-with-res-device-schalungsroboter-mit-res-geraet/

Liebherr Betomat III-570 – concrete mixing plant / Betonmischanlage

ID: 2123
year/Baujahr: 1985-2001

ID2123 Liebherr Betomat III-570 year/Baujahr 1985-2001 complete concrete mixing plant with 3 mixers (2 x ZE1500 / 2250, 1 x ZE 500/750), Sauer dosing system (year of construction approx. 2005) komplette Betonmischanlage mit 3 Mischern (2 x ZE1500/2250, 1 x …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/liebherr-betomat-iii-570-concrete-mixing-plant-betonmischanlage/

Complete sand-lime brick plant / komplettes Kalksandstein-Werk

ID: 2267

ID2267 Complete sand-lime brick plant Kalksandstein-Werk Complete sand-lime brick plant, output 70,000-120,000 NF per day (2 shifts of 8 hours each), more information on request komplettes Kalksandstein-Werk, Leistung 70.000-120.000 NF pro Tag (2 Schichten a’ 8 Std), mehr Infos auf …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/complete-sand-lime-brick-plant-komplettes-kalksandstein-werk/

Putzmeister – concrete pump with e-motor / Betonpumpe mit E-Motor

ID: 2259

ID2259 Putzmeister concrete pumpe with e-motor concrete pump with e-motor, 2 pistons (100 mm piston, stroke approx. 1 meter) Betonpumpe mit E-Motor, 2 Kolben (100 mm Kolben, Hub ca. 1 Meter)

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/putzmeister-concrete-pump-with-e-motor-betonpumpe-mit-e-motor/

Pedershaab Multiflex – Plant for production of concrete pipes

ID: 2149

ID2149 Pedershaab Multiflex – Plant for the production of concrete pipes Plant for the production of concrete pipes, little used, with concrete feeder, with 10 jackets for 1m pipes, with 4 cores (300, 400, 500, 600 mm diameter) for 1m …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/pedershaab-multiflex-plant-for-production-of-concrete-pipes/

Sommer – Folding pallet system for the production of double wall elements

ID: 2018

Sommer Folding pallet system for the production of double wall elements Klapp-Paletten-Anlage zur Herstellung von Doppelwandelementen year/Baujahr 1979 Folding pallet system for the production of double wall elements consisting of a 180 ° swiveling pallet (7200 x 3070 mm), adjustable …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/sommer-folding-pallet-system-for-the-production-of-double-wall-elements/

Obermann MPR800 – concrete mixer / Betonmischer

ID: 1914
year/Baujahr: 2005
hours/Stunden/Kilometer: 6810
weight/Gewicht (t): 3,8 t

ID1914 Obermann MPR800 year/Baujahr 2007 approx. 6800 hours/Stunden 3,8 t 3 units – Mixer, capacity 16 cbm / h at 20 cycles, 20.8 cbm / h at 26 cycles, incl. 2 cement screw conveyors 3 Stück – Mischer, Leistung 16 …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/obermann-mpr800-concrete-mixer-betonmischer/

Häny MCM-2000 – suspension mixing plant / Suspensions-Mischanlage

ID: 1887
year/Baujahr: 1998

ID1887 Häny MCM-2000 year/Baujahr 1998 Mixing plant Häny MCM-2000. The mixing plant was in this configuration as a unit on the way and was used for the mixing of cement and sealing wall suspensions, without silo! Mischanlage Häny MCM-2000. Die …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/haeny-mcm-2000-suspension-mixing-plant-suspensions-mischanlage/

Elba RSK 30C – Stern-Schrapper

ID: 1855
year/Baujahr: 1992

Elba RSK 30C – Stern-Schrapper year/Baujahr 1992 Elba Radialschrapp automat RS/M 40, 17,3 m, 4-part lattice boom for scrapers Elba Radialschrapp-Automat RS/M 40, 17,3 m, 4-teiliger Gitterausleger für Schrapper

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/elba-rsk-30c-stern-schrapper/

Sandau B91 – Residual water recycling plant / Restwasser Recyclinganlage

ID: 1845
year/Baujahr: 1996

ID1845 Sandau B91 – Residual water recycling plant year/Baujahr 1996 6,5 t Residual water recycling plant, with control unit, almost not used (as new), power 25 cbm / h Restwasser Recyclinganlage, mit Schaltkasten, fast nicht benutzt (neuwertig), Leistung 25 cbm/h

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/sandau-b91-residual-water-recycling-plant-restwasser-recyclinganlage/

Krupp GFT – Complete additive dosing / Komplette Additivdosierung

ID: 1738
year/Baujahr: 1996

Complete additive dosing, 8 pieces of small component containers a ‘1 cbm, 2 pieces of scales Pfister, blow-through lock with pre-tank, there are no motors from the screws and various knockers or vibrators from the suction system Komplette Additivdosierung, 8 …

Continue reading

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/krupp-gft-complete-additive-dosing-komplette-additivdosierung/

STS Scheltzke HD130 2-A – High-pressure injection pump / Hochdruckinjektionspumpe

ID: 1678
year/Baujahr: 1993
hours/Stunden/Kilometer: 8000
weight/Gewicht (t): 3 t

High-pressure injection pump, 55 KW Hochdruckinjektionspumpe, 55 KW

Permanentlink zu diesem Beitrag: https://www.bosch-baumaschinen.de/sts-scheltzke-hd130-2-a-high-pressure-injection-pump-hochdruckinjektionspumpe/